The LNG plant on the Maitland Industrial Estate is located approximately 50km west, south-west of Karratha. The plant is supplied by North West Shelf Gas, delivered via a 3.2km pipeline spur from the Dampier Bunbury Natural Gas Pipeline.
-
Off-site electrical engineering services were provided to assist in the preparation of electrical drawings and cable schedules, cable sizing, cable entity calculations, and peer-reviews.
-
On-site electrical engineering services were provided to assist in the construction and commissioning of the plant, including 3 x gas turbines Solar Centaur (11kV), 11kV switchboard, 11kV capacitor switchboard, 3.3kV compressor motors, 415V MCC, PLC panel, distribution boards, switch room and process plant.
This included the preparation of work orders, procurement, planning, schedules and reports.